PT. Tri Wahana Universal (TWU) through a sub contractor of PT. Salwa, ensuring two crude oil tanks AB (oil storage) capacity of 21 berel been ready for use, in January 2009. Two tank that serves to accommodate crude oil from wells Banyuurip Field has been completed pengelesan. Even the two who are in yangki Village Sumnegko, Kalitidu District, is also carried out three test covering grafi Radoi, penetran, and vacuum tests. Non dektoratif test (NDT) was performed to determine the weld strength.
"93 percent good results. From 78 films, only 3 of freeper (repeated), "said Operartor Radio Grafi PT. Titis Samporna F. Liestyono Bhuwono. PT. Tilis Samoperna is one of the trusted company PT. Her to perform testing tanks and pipes in a mini refinery.
After conducting tests on non dektoratif these two tanks PT. Lilis Samporna will continue with the trial of hydro test (water test). Test was performed to determine the strength Walder (welding) and the receiving tank before the pressure before use to accommodate future crude oil. "Two of this tank is ready to use. For all the tests we have done and the results of two tanks had been eligible to menampun crude oil, "Liestyono clear, convincing.
With the completion of testing these two tanks AB, will continue to test the four other tanks. In this trial the company specialized in testing of pipes and storage tanks of oil and gas every day can test the welding point 20. For testing they do wait lonely project activities. This was done to maintain safety and minimize (reduce) the impact of radiation from the test equipment.
"To test the tank's four new 35 per cent. All tesny equal to the previous two tanks, "explained the man who had done pentesan in crude oil tanker owned by PetroChina.
According to him, testing of crude oil storage tank is not seribet test for the gas tank. Because the oil tank testing is quite taken sempel (sample) at random from las rastusan connection in the tank. Nevertheless, to determine the quality of the oil tank will be another test once every 3 years.
"If the gas tank shaped like a ball that could not be done randomly, but all weld connections should be tested one by one," said Liestyo.
Acceleration of the settlement continued to be a mini refinery PT. Grace Salawa Universe. The reason this is now the beginning of the production wells has been done Banyuurp Mobil Cepu Limited (MCL), 10 December. However, due to a number of unfinished production facility, finally subsidiary ExxonMobil Oil Indonesia (EMOI) hauled in three tank cars to Central processing area (CPA) Mudi Field, owned by Pertamina-PetroChina, Rahayu Village, Sub Suko, Tuban.
As a result of not kelarnya production supporting facilities such as Piping Banyuurip-Mudi along 40 km, Early Production Facility (EPF), and a mini refinery, the amount of initial production wells Banyuurip not originally targeted. Than 20,000 barrels per day of service promised Cepu Block, teralisasi only about 94 barrels per day.
"January berkpasitas two 21 barrel tanks that is ready to accommodate crude oil from Banyuurip," said A. Alamsyah accompanying ketia Director of PT. Grace Universe Salawa A. Syaefudin mini refinery location.
According to him, which was built 16 tank PT. Salwa later will accommodate crude oil from the Field Banyuurip for 6000 barrels per day. Then the crude oil was processed into diesel oil and ships. Development of a mini refinery is located on an area of 7.2 ha. Besides building 16 tanks, to complete a facility on a mini refinery location, company engaged in engineering-procurement-construction is also developing several civilian buildings done by some local CV. Build civil works include the creation of two posts scurity, office (the office), MCC, maintenance (workshop space), down house, small mosque, and the fence.
"To stay civilnya building finising. While the construction of 16 tanks we completed in March next target, "stated A. Alamsyah PR PT. Salwa Grace Universe.
Hopefully with the existence of a mini refinery can increase the supply of oil demand in East Java and Central Java. It also could open opportunities for citizens around the location of oil processing, especially the Bojonegoro. Whether it's a power driver that distributes oil and oil processing power when starting